Displaying 20 item(s) ›› Today is February 28, 2017
›› Luzon A PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
1Construction of Mountain Province Arabica Coffee Enterprise's Civil Works
IB-RCAR-MOP-004-000-000-17
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Mountain Province
Municipality: Bontoc
Civil Works composed of 5 Packages namely: Improvement and Construction of Mountain Province Arabica Coffee Enterprise Consolidation and Trading Center; Construction of Bagnen Satellite Buying Station; Construction of Otucan Satellite Buying Station; Construction of Sagada Satellite Buying Station and Construction of Tadian Satellite Buying Station 8,079,150.78February 03, 2017February 22, 2017March 07, 2017 10:00AMDownloadOpenView
2Construction of Slope Protection of Villaviciosa, Abra
IB-RCAR-ABR-008-VIL-001-17
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Abra
Municipality: Villaviciosa
Slope Protection to be constructed at Villaviciosa, Abra within 153 calendar days. 30,000,000.00February 01, 2017February 15, 2017March 03, 2017 10:30AMDownloadOpenView
3NEW CONSTRUCTION OF BARANGAY SAN ANTONIO-PARANG-SAYSAIN Farm to Market Road
IB-R003-BAT-001-000-000-17
PSO: Luzon A PSO
Region: Central Luzon (Region III)
Province: Bataan
Municipality: undefined
Farm to Market Road to be Constructed at Barangay San Antonio, Parang and Saysain, Bagac, Bataan. The intended completion date is 393 calendar days inclusive of 57 unworkable calendar days.157,571,000.00February 01, 2017February 17, 2017March 03, 2017 10:00AMDownloadOpenView
4Construction of Cambulao Level-II Water System
IB-RCAR-IFU-008-000-000-17
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Ifugao
Municipality: Aguinaldo
Level II Water System to be constructed at Cambulao, Banaue, ifugao with a contract cost of Php4,643,000.00 for 100 calendar days inclusive of 21 unworkable days.4,643,000.00January 31, 2017February 08, 2017March 03, 2017 10:00AMDownloadOpenView
5Construction of Bangaan Level-II Water System
IB-RCAR-IFU-005-000-000-17
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Ifugao
Municipality: Banaue
Level II Water System to be constructed at Bangaan, Banaue, Ifugao with an estimated project cost of Php5,741,000.00. The required no. of days to finish the construction is 113 calendar days.5,741,000.00January 31, 2017February 08, 2017March 03, 2017 10:00AMDownloadOpenView
6Rehabilitation of Bitag Pequeño Communal Irrigation System
IB-R002-CAG-009-BAG-001-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Cagayan
Municipality: Baggao
Communal Irrigation System at Brgy. Bitag Pequeño, Baggao, Cagayan with an estimated project cost of Php12,993,000.00 to be accomplished within 210 calendar days inclusive of 42 unworkable days. 12,993,000.00January 27, 2017February 09, 2017March 01, 2017 10:00AMDownloadOpenView
7Construction of Aguinaldo Small Water Impounding Project
IB-R002-ISA-013-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Naguilian
Small Water Impounding Project at Brgy. Aguinaldo, Naguilian, Isabela with an estimated project cost of Php3,488,000.00 to be accomplished within 180 calendar days. 3,488,000.00February 01, 2017February 21, 2017March 07, 2017 10:00AMDownloadOpenView
8Construction of Capirpiriwan Diversion Dam
IB-R002-ISA-0009-000-0001-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Cordon
Diversion Dam to be constructed at Brgy. Capirpiriwan, Cordon, Isabela with an estimated project cost of Php5,673,000.00 to be completed within 240 calendar days. 5,673,000.00February 01, 2017February 21, 2017March 07, 2017 10:00AMDownloadOpenView
9Construction of Dummon Small Water Impounding Project
IB-R002-ISA-017-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Quezon
Small Water Impounding Project at Brgy. Dummon, Quezon, Isabela with an estimated project cost of Php3,310,000.00 to be accomplished within 180 calendar days.3,310,000.00February 01, 2017February 21, 2017March 01, 2017 10:00AMDownloadOpenView
10Construction of Kabigaan Small Water Impounding Project II
IB-R002-ISA-018-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Alicia
Small Water Impounding Project at Brgy. Simimbaan, Roxas, Isabela with an estimated project cost of Php12,107,000.00 to be accomplished within 330 calendar days. 12,107,000.00February 01, 2017February 21, 2017March 01, 2017 10:00AMDownloadOpenView
11Construction of Lapu-Lapu Small Water Impounding Project
IB-R002-ISA-0014-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Alicia
Small Water Impounding Project at Manaring, Naguilian, Isabela to be accomplished in a total of 330 calendar days with an estimated project cost of Php11,098,000.00. 11,098,000.00February 01, 2017February 21, 2017March 01, 2017 10:00AMDownloadOpenView
12Construction of Namnama Small Water Impounding Project
IB-R002-ISA-012-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Alicia
Small Water Impounding Project at Brgy. Namnama, Cumabao, Tumauini, Isabela with an estimated project cost of Php10,660,000.00 to be completed within 270 calendar days.10,660,000.00February 01, 2017February 21, 2017March 01, 2017 10:00AMDownloadOpenView
13Construction of San Jose Small Water Impounding Project
IB-R002-ISA-019-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Jones
Construction of Small Water Impounding Project at Brgy. San Jose, Jones, Isabela to be accomplished in 330 calendar days inclusive of 60 unworkable days with an estimated project cost of Php9,722,000.00. 9,722,000.00February 01, 2017February 21, 2017March 01, 2017 10:00AMDownloadOpenView
14Construction of Santos Small Water Impounding Project
IB-R002-ISA-0015-000-0002-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Quezon
Small Water Impounding Project at Brgy. Santos, Quezon, Isabela with an estimated project cost of Php7,699,000.00 to be constructed within 180 calendar days inclusive of 30 unworkable days. 7,699,000.00February 01, 2017February 21, 2017March 07, 2017 10:00AMDownloadOpenView
15Construction of Timpuyug Small Water Impounding Project
IB-R002-ISA-015-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Isabela
Municipality: Alicia
Small Water Impounding Project at Brgy. Sto. Domingo, Quirino, Isabela with an Estimated Project Cost of Php12,754,000.00 to e constructed within 330 calendar days inclusive of 60 unworkable days. 12,754,000.00February 01, 2017February 21, 2017March 07, 2017 10:00AMDownloadOpenView
16SUPPLY, DELIVERY AND INSTALLATION OF COLD STORAGE FACILITIES AND EQUIPMENT
IR-R003-BAT-001-000-000-17
PSO: Luzon A PSO
Region: Central Luzon (Region III)
Province: Bataan
Municipality: Mariveles
Sub-project packaged into 2: Various Cold Storage Facilities and Equipment; Cold Storage for 5 tons dried/processed fish. Delivery and Installation of the Goods is required within Fifty (50) calendar days. The project site will be in Brgy. Batangas II, Mariveles, Bataan wherin delivery and installation will be conducted.9,340,000.00February 01, 2017February 15, 2017March 03, 2017 10:00AMDownloadOpenView
17Establishment of Ice Plant with Cold Storage Building
IR-R003-BAT-0004-000-0002-17
PSO: Luzon A PSO
Region: Central Luzon (Region III)
Province: Bataan
Municipality: Mariveles
Establishment of Ice Plant with cold storage to be constructed at Brgy. Batangas II, Mariveles, Bataan with an estimate project cost of Php8,075,000.00 to be completed within 159 calendar days. 8,075,000.00February 01, 2017February 15, 2017March 03, 2017 10:00AMDownloadOpenView
18Construction of Processing Center for Quirino Banana Enterprise
IB-R002-QUI-014-000-000-17
PSO: Luzon A PSO
Region: Cagayan Valley (Region II)
Province: Quirino
Municipality: Maddela
Construction of Processing Center for Banana Enterprise at Cofcaville, Maddela, Quirino with an estimated project cost of Php2,197,000.00 to be accomplished within 84 calendar days. 2,197,000.00February 03, 2017February 22, 2017March 07, 2017 10:00AMDownloadOpenView
Total: 315,150,150.78
›› Luzon B PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
1Construction and Concreting of Bual-bualan Farm to Market Road
IB-R04B-PAL-007-PUE-002-14
PSO: Luzon B PSO
Region: MIMAROPA (Region IV-B)
Province: Palawan
Municipality: Puerto Princesa City
Construction and Concreting of 2,989.80 linear meter x 5.00 meter width x 0.15 meter thick with 1.50 meter shoulder length29,141,000.00February 03, 2017February 22, 2017March 06, 2017 02:00PMDownloadOpenView
2Construction of Atulayan-Bislian- Pamatdan FMR Project
IB-R04A-QUE-026-POL-001-2015
PSO: Luzon B PSO
Region: CALABARZON (Region IV-A)
Province: Quezon
Municipality: Polillo
Concreting of PCCP with length of 11,686.90 m x 5.00 m width x 0.15m thickness and 19 lines cross drainage RCPC of 910mm dia.157,463,000.00January 31, 2017February 16, 2017March 01, 2017 02:30PMDownloadOpenView
›› Visayas PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
Total:
›› Mindanao PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
Total:
National Summary
Region No. of Subprojects EPC (pesos)
CAR 4 48,463,150.78
1 0
2 11 91,701,000.00
3 3 174,986,000.00
4a 1 157,463,000.00
4b 1 29,141,000.00
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
ARMM 0
Total 20 501,754,150.78
PSO Program Support Office
SP Subproject
PBD Philippine Bidding Documents
EPC Estimated Project Cost
FMR Farm to Market Road
PWS Potable Water System
IRRI Irrigation