Displaying 16 item(s) ›› Today is May 26, 2017
›› Luzon A PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
1Construction of Cambulao Level-II Water System
IB-RCAR-IFU-008-000-000-2016
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Ifugao
Municipality: Aguinaldo
Level II Water System to be constructed at Cambulao, Banaue, ifugao with a contract cost of Php4,643,000.00 for 100 calendar days inclusive of 21 unworkable days.4,643,000.00May 03, 2017May 10, 2017June 02, 2017 10:00AMDownloadOpenView
2Construction of Bangaan Level-II Water System
IB-RCAR-IFU-005-000-000-2016
PSO: Luzon A PSO
Region: Cordillera Administrative Region (CAR)
Province: Ifugao
Municipality: Banaue
Level II Water System to be constructed at Bangaan, Banaue, Ifugao with an estimated project cost of Php5,741,000.00. The required no. of days to finish the construction is 113 calendar days.5,741,000.00May 03, 2017May 10, 2017June 02, 2017 10:00AMDownloadOpenView
Total: 10,384,000.00
›› Luzon B PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
1Concreting/Upgrading of Brgy. Poblacion FMR (So. Genaro-So. Olima & So. Cawit-Nat’l. Road)
IB-R04B-OCM-001-000-000-17
PSO: Luzon B PSO
Region: MIMAROPA (Region IV-B)
Province: Occidental Mindoro
Municipality: Magsaysay
Road rehabilitation/improvement of 9,800.00 m PCCP with 5.00m width and 0.15m thickness; Shoulder width of 1.50m on both sides; Total formation width of 10.00m and 158.00 linear meter RCPC97,988,000.00April 28, 2017May 16, 2017May 30, 2017 02:00PMDownloadOpenView
2Construction & Upgrading of Nicanor Zabala-San Miguel-Jolo FMR
IB-R04B-PAL-012-ROX-001-17
PSO: Luzon B PSO
Region: MIMAROPA (Region IV-B)
Province: Palawan
Municipality: Roxas
Construction and upgrading of 11,709.00m PPCP length of 4.00m width, PCCP thickness of 150mm with 1.50m shoulder width on both side117,735,000.00May 09, 2017May 25, 2017June 08, 2017 02:00PMDownloadOpenView
Total: 215,723,000.00
›› Visayas PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
Total: 141,777,000.00
1Rehabilitation of Anonang Sur - Lambusan Farm to Market Road
IB-R007-CEB-001-000-000-17
PSO: Visayas PSO
Region: Central Visayas (Region VII)
Province: Cebu
Municipality: Bogo City
PCCP Length: 5.817 m. PCCP Width: 5 m. PCCP Thickness: 150 mm. Shoulder Width: 1.5 m. Formation Width: 11 m. RCPC: 153 l.m. The Anonang Sur - Lambusan Farm-to-Market Road subproject aims for a 50 percent increase in traffic count by end of Year 20 and a reduction in average travel time from farm to market by at least 60 percent on the first year of project completion.57,503,000.00May 12, 2017May 30, 2017June 15, 2017 10:00AMDownloadOpenView
2Rehabilitation of Dapdap - Batad Farm to Market Road
IB-R007-CEBU-002-000-000-17
PSO: Visayas PSO
Region: Central Visayas (Region VII)
Province: Cebu
Municipality: San Remigio
PCCP Length: 5.726 m. PCCP Width: 5 m. PCCP Thickness: 150 mm. Shoulder Width: 1.5 m. Formation Width: 11 m. RCPC: 285 l.m. The Philippine Rural Development Project seeks to break the cycle of high production costs, market inaccessibility, and low productivity through the provision of strategic agriculture infrastructure, research and development, and knowledge and information dissemination. In the long run, the Project aims to increase annual real farm incomes of household beneficiaries by 5 percent, vis-a-vis the projected 2-4% increase as envisioned in the Philippine Development Plan. The Dapdap-Batad Farm-to-Market Road subproject aims for a 50 percent increase in traffic count by Year 20 and a reduction in average travel time from farm to market by at least 60 percent on the first year of project completion.56,301,000.00May 12, 2017June 06, 2017June 20, 2017 10:00AMDownloadOpenView
3Rehabilitation of Kinawahan - Canagahan Farm to Market Road
IB-R007-CEB-003-000-000-17
PSO: Visayas PSO
Region: Central Visayas (Region VII)
Province: Cebu
Municipality: San Remigio
PCCP Length: 2,715 m. PCCP Width: 5 m. PCCP Thickness: 150 mm. Shoulder Width: 1.5 m. Formation Width: 11 m. RCPC: 132 l.m. RCBC: 3.66 l.m. The Kinawahan-Canagahan Farm-to-Market Roas subproject specifically aims to: (1) increase traffic count by 50 percent in Year 20; (2) reduce average travel time from farm to market by at least 75 percent on the first year; (3) reduce hauling cost of output by at least 30% on the first year; (4) reduce hauling cost of inputs by at least 30% on the first year; (5) incur savings in vehicle operating cost by at least 10 percent on the first year; (6)increase delivery of basic social services, agricultural and technological services, and other LGU provisions to marginal farmers and fisher folks to 90%. Expectedly, the Kinawahan-Canagahan FMR will allow farmers to command better prices for their goods in two ways: firstly, they can sell their produce in the local market and do away with selling to "agents" who dictate the price of their goods; and secondly, they will be able to take advantage of lower farm operating costs (easier transport and access).27,973,000.00May 12, 2017June 08, 2017June 27, 2017 10:00AMDownloadOpenView
›› Mindanao PSO
No. Name of SP SP Location SP Description Total EPC (pesos) Published Date Pre-bidding Conference Bid Opening Download PBD Philgeps Link View in Google Earth
1Construction of Six (6) Units Watch Tower
IB-R013-SDS-008-C OR-001-2016
PSO: Mindanao PSO
Region: Caraga (Region XIII)
Province: Surigao del Sur
Municipality: Cortes
The subproject name is Construction of Six (6) units Watch Tower located at Municipality of Cortes, Surigao del Sur with a physical target 330 calendar days. The estimated project cost for this project is Thirteen Million One Hundred Seventy Six Thousand Pesos Only (Php 13,176,000.00).13,176,000.00April 28, 2017May 18, 2017May 31, 2017 10:00AMDownloadOpenView
2Concreting of Bucac Marcelina-Mahapag-San Vicente FMR (Package 3: Concreting of San Vicente-Mahapag FMR) (Sta. 0+218.57-Sta. 12+140)
IB-R013-ADS-007-000-000-17
PSO: Mindanao PSO
Region: Caraga (Region XIII)
Province: Agusan del Norte
Municipality: Buenavista
The subproject name is Concreting of San Vicente-Mahapag FMR (Package 3) (Sta. 0+218.57-12+140) with a physical target of 11.92 kms.. The located project at Municipality of Prosperidad, Agusan del Sur with 570 calendar days. The estimated project is Php 199,500,000.00.199,500,000.00May 10, 2017June 01, 2017June 27, 2017 10:00AMDownloadOpenView
3Concreting of Bucac Marcelina-Mahapag-San Vicente FMR (Package 2: Concreting of Marcelina-Mahapag FMR) (Sta. 9+020-Sta. 22+320)
IB-R013-ADS-007-000-000-17
PSO: Mindanao PSO
Region: Caraga (Region XIII)
Province: Agusan del Sur
Municipality: Bayugan City
The subproject name is Concreting of Bucac-Marcelina-Mahapag San Vicente FMR (Package 2: Concreting of Marcelina-Mahapag FMR) Sta. 9+020-Sta. 33+320 with a pysical target 13.30 kms. The located project at Mun icipality of Bayugan-San Luis, Agusan del Sur with 570 calendar days. The estimated project cost is Php 215,604,000.00.215,604,000.00May 10, 2017May 25, 2017June 20, 2017 10:00AMDownloadOpenView
4Construction of DSL Potable Water System
IB-R011-DOR-12-MAT-06-17
PSO: Mindanao PSO
Region: Davao Region (Region XI)
Province: Davao Oriental
Municipality: Mati City
Construction of PWS with 2 units intake box, 43.93 cu.m ground reservoir, 14 units tapstands, and 4.00 sq.m Chlorinator shed10,368,000.00May 19, 2017June 07, 2017June 21, 2017 10:00AMDownloadOpenView
5REHABILITATION AND CONCRETING OF BULACAO-CONCEPCION PROPER-LALIGAN JUNCTION FARM TO MARKET ROAD
IB-R010-BUK-013-VAL-001-17
PSO: Mindanao PSO
Region: Northern Mindanao (Region X)
Province: Bukidnon
Municipality: Valencia City
Rehabilitation/ Concreting of Bulacao-Concepcion Proper-Laligan Junction Farm to Market Road is located at Valencia City, Bukidnon. Completion of the Works is required by 547 calendar days with 8.10 km.103,855,000.00May 19, 2017June 07, 2017June 20, 2017 10:00AMDownloadOpenView
6Design, Fabrication, Installation & Commisioning of VCO Processing Machinery
IR-R012-SAR-0001-000-000-17
PSO: Mindanao PSO
Region: SOCCSKSARGEN (Region XII)
Province: Sarangani
Municipality: Malapatan
Design, Fabrication, Installation & Commissioning of VCO Processing Machinery. The VCO Machine shall have a minimum input capacity of 8,000 nuts per shift in a dry process plant. There will be two shifts a day.22,439,000.00May 23, 2017June 06, 2017June 23, 2017 09:00AMDownloadOpenView
7Concreting of Mahapag - Dona Maxima FMR
IB-R013-ADS-004-000-000-2015
PSO: Mindanao PSO
Region: Caraga (Region XIII)
Province: Agusan del Sur
Municipality: San Luis
Concreting of 8.93 km rural road at San Luis, Agusan del Sur with contract duration of 547 calendar days.135,930,000.00May 03, 2017May 25, 2017June 08, 2017 10:00AMDownloadOpenView
8FARM MECHANIZATION IN SUPPORT TO RICE PRODUCTION
IR-R010-BUK-099-000-001-17
PSO: Mindanao PSO
Region: Northern Mindanao (Region X)
Province: Bukidnon
Municipality: Malaybalay City
Farm Mechanization in support to Rice Production for calamity stricken areas in the Province of Bukidnon, under I-REAP component, Small Livelihood Projects. This project will support the pre/post harvest facilities of the farmer thru Supply and Delivery of 29 units farm tractor with implements.29,000,000.00May 22, 2017June 08, 2017June 22, 2017 10:00AMDownloadOpenView
9Rehabilitation and Concreting of Aurora - Sto. Niño Farm to Market Road
IB-R010-BUK-011-MAN-002-17
PSO: Mindanao PSO
Region: Northern Mindanao (Region X)
Province: Bukidnon
Municipality: Manolo Fortich
Rehabilitation and Concreting of Aurora- Sto. Niño Farm to Market Road is located at the Municipality of Manolo Fortich, Bukidnon. The Intended Completion Date is 205 calendar days with 3.04 km.31,022,000.00May 19, 2017June 06, 2017June 21, 2017 10:00AMDownloadOpenView
Total: 760,894,000.00
National Summary
Region No. of Subprojects EPC (pesos)
CAR 2 10,384,000.00
1 0
2 0
3 0
4a 0
4b 2 215,723,000.00
5 0
6 0
7 3 141,777,000.00
8 0
9 0
10 3 163,877,000.00
11 1 10,368,000.00
12 1 22,439,000.00
13 4 564,210,000.00
ARMM 0
Total 16 1,128,778,000.00
PSO Program Support Office
SP Subproject
PBD Philippine Bidding Documents
EPC Estimated Project Cost
FMR Farm to Market Road
PWS Potable Water System
IRRI Irrigation